Shoreline and lakeshore work in South Dakota can touch several agencies. This checker asks four quick questions and shows you which offices to contact based on your answers. It is a starting point, not a permit decision. Rules change and every site is different, so check with each office before work starts.
Is the work along a lake, slough or wetland?
Want help planning it?
Call Greg at (605) 880-1823. We work lake country and can talk through what to check.
Who to check with for lakeshore work
Here is the full checklist of offices to contact for shoreline and lakeshore projects in South Dakota. Not every project needs every office, but these are the ones to consider.
- •South Dakota Game, Fish and Parks for lakeshore work on lakes
- •U.S. Army Corps of Engineers for fill or rock below the water line
- •The local USDA office and U.S. Fish and Wildlife Service for farm program or easement land
- •The county or city zoning office for new buildings
- •South Dakota 811 at least 48 hours before digging
Rules change and every site is different. Check with each office before work starts.
Questions
Do I need a permit for shoreline work on a lake in South Dakota?
Maybe. South Dakota Game, Fish and Parks says a permit may be required for shoreline work on lakes. Check with them before work starts.
Do I need a permit to place rock below the water line?
Placing fill or rock below the water line in lakes, rivers or wetlands can need a Section 404 permit from the U.S. Army Corps of Engineers. Check before work starts.
What about wetlands and farm program land?
Before filling, draining or clearing wetlands, check with the local USDA office if the land is in a farm program, and check whether the land carries a U.S. Fish and Wildlife Service easement.
Who do I call before digging?
South Dakota 811, at least 48 hours before any excavation. Call 811 or visit sdonecall.com.
For the full rules in plain language, read our South Dakota digging and shoreline guide.