Althoff Excavation logoAlthoff Excavation

Recent projects

Real jobs around Waubay and the Glacial Lakes region.

Project write ups

Large rock riprap placed along a shoreline to hold the bank

Shoreline stabilization at Lynn Lake

Shoreline stabilization at Lynn Lake. We placed rock along the bank to hold the shoreline and stop erosion into the lake.

Old garage structure standing before demolition

Garage demolition in Webster

Demolition of garages in Webster. We took the structures down, hauled off the debris and left the lots clean.

Graded house pad and slope cut into a hillside with trees on the lot

Driveway slope north of Webster

Site prep for a house north of Webster where we cut the hill down into a gradual slope for the driveway.

Cleared and leveled ground ready to be farmed

Tree removal and farm ground

A tree removal job where we also leveled an old road bed so the whole piece could be farmed.

Track marks across black dirt on a cold work site

December dirt work

Still moving dirt in mid December when the fall weather allowed.

Call GregFree Estimate